The client is planning to build a new steel hall with a car wash at the Pratteln site. The construction consists of a foundation in solid construction and a steel construction placed on top. A hoover hall, car wash, checkout area, social rooms, H2 tanks and an H2 petrol station are planned. Some areas require fire protection measures.
Project
Rytz AG is realising the steel hall, panel façade incl. EI90 façade, sheet metal cladding, ticket office, gates/windows/doors and a mullion/transom construction in the north and west façades.
The order includes planning, production and assembly.